lately iOS: declare the iOS 18 floor the code already assumes #44

Merged
founder merged 1 commit from lately-ios-min-os-18 into main 2026-08-16 08:46:55 +00:00
Owner

TestFlight rejected Lately-iOS-136.ipa: ITMS-90715 — LatelyContacts.appex requires iOS 18 (Contact Provider extension point). Bazel targets said 15.0; SwiftPM declared .iOS(.v18). Bump the release/simulator app and both extensions to 18.0.

🤖 Generated with Claude Code

TestFlight rejected `Lately-iOS-136.ipa`: `ITMS-90715 — LatelyContacts.appex requires iOS 18` (Contact Provider extension point). Bazel targets said 15.0; SwiftPM declared `.iOS(.v18)`. Bump the release/simulator app and both extensions to 18.0. 🤖 Generated with [Claude Code](https://claude.com/claude-code)
lately iOS: declare the iOS 18 floor the code already assumes
All checks were successful
Namespace: Build Images / Refresh macOS runner lane (push) Successful in 6s
Release: If Needed / Check (Release Needed) (push) Successful in 7s
Build: Apple / Check (SwiftLint) (pull_request) Successful in 19s
Build: Apple / Check (SwiftLint) (push) Successful in 17s
Build: Apple / Build (visionOS) (pull_request) Successful in 26s
Build: Apple / Build (iOS) (pull_request) Successful in 29s
Build: Apple / Build (iOS) (push) Successful in 30s
Build: Apple / Build (visionOS) (push) Successful in 23s
Namespace: Build Images / Refresh Linux runner image (push) Successful in 1m38s
Build: Apple / Build (macOS) (pull_request) Successful in 1m48s
Deploy: Web / Deploy (Web) (push) Successful in 2m18s
Build: Apple / Build (macOS) (push) Successful in 1m52s
Deploy: API / Deploy (API) (push) Successful in 3m6s
ec691a024a
App Store Connect rejected Lately-iOS-136.ipa with ITMS-90715: the Contacts
extension (a Contact Provider, an iOS 18 extension point) declared
MinimumOSVersion 15.0. The SwiftPM package these Bazel targets replaced
declared .iOS(.v18); the release and simulator app plus both extensions now
say 18.0 too.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Sign in to join this conversation.
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
key-store/key.store!44
No description provided.