KSE-0182 B.0: correct the withdrawal date (2026-08-22 UTC) and record deploy 18952 #167

Merged
founder merged 1 commit from kse/0182-b0-date into main 2026-08-22 04:07:47 +00:00
Owner

Docs-only follow-up to #166: the decision/PR date is 2026-08-22 UTC (08-21 Pacific), not 08-19 (that date belongs to the live status check). Also logs that deploy-forge-host run 18952 switched the forge to 37166037 and carried the waiting 08-19 fixes. One comment line in nixos/keystore-forge.nix; no unit changes.

🤖 Generated with Claude Code

Docs-only follow-up to #166: the decision/PR date is 2026-08-22 UTC (08-21 Pacific), not 08-19 (that date belongs to the live status check). Also logs that deploy-forge-host run 18952 switched the forge to 37166037 and carried the waiting 08-19 fixes. One comment line in nixos/keystore-forge.nix; no unit changes. 🤖 Generated with [Claude Code](https://claude.com/claude-code)
KSE-0182 B.0: correct the withdrawal date (2026-08-22 UTC) and record the deploy
Some checks failed
Deploy: API / Deploy (API) (push) Failing after 3s
Release: If Needed / Check (Release Needed) (push) Successful in 5s
Deploy: Web / Deploy (Web) (push) Has been cancelled
a4cb4fad3e
The decision and PR #166 happened on 2026-08-22 UTC (08-21 Pacific), not
08-19 (the 08-19 date belongs to the live status check). Logs that
deploy-forge-host run 18952 switched the forge to 37166037 and carried the
08-19 fixes (materializer refresh oneshot, authentik-smoke, Caddy boot
ordering) that had been waiting for a switch.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
founder deleted branch kse/0182-b0-date 2026-08-22 04:07:48 +00:00
Sign in to join this conversation.
No labels
No milestone
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
key-store/key.store!167
No description provided.